Economy Shower Unit
STEEL CHASSIS
The Economy Shower unit has a sunken shower area. This gives a better flow of water, and the floor is easier to dry in a short period of time.
A significant reduction of weight can be achieved with the right focus on applying the flow gradient when the steel chassis is formed.
HOISTING OF THE ECONOMY SHOWER UNIT
Every Economy Shower Unit comes with clear instructions for hoisting and placement. The shower unit shall be lifted and moved to the proper position, while stability shall be maintained during the hoisting process.
The four rings on top of the wet unit must be hoisted. When less rings used to lift the wet unit mau cause tipping over or decoupling hazards.
After the unit is positioned, the rainproof cover on top of the Economy Shower Unit must be removed in time to avoid a fire accident during welding and installation.
POSITIONING OF THE BATHROOM UNIT
The bottom plate of the wet unit can be adjusted in case the ground is uneven.
After adjusting the bathroom unit to the level, weld the anchor bolt to the deck.